Sveti Ivan Zelina gets an aquapark worth six million euros

first_imgThe City of Sveti Ivan Zelina has been handed over the main project, ie the complete project documentation for the Zelina Aquapark, which the City will now send to public law bodies and request their consent for the issuance of a building permit.The aquapark project will be realized in the area of ​​the former Zelina pools, which in the second half of the last century were one of the most beautiful tourist centers in continental Croatia and a favorite picnic spot for thousands of Zagreb residents and others who came to swim in Sveti Ivan Zelina.The last fifteen years are no longer in operation, and in 2013 the City of Sveti Ivan Zelina began preparing the space and documentation to revitalize this area again. The project documentation consists of 14 parts of the main project and 4 studies, and was prepared by the company PulSaR arhitektura doo from Zagreb. “Obtaining a building permit is the final step before starting work. It is the most concrete indicator of our seriousness and determination to realize the Aquapark Zelina project, which the citizens are looking forward to.”Said Mayor Hrvoje Košćec during the handover of documentation.The conceptual solution for Aquapark Zelina was made by the company ActionPark WaterScapes from Spain in 2016, which is designed so that the project is realized in stages. In the first phase, water surfaces intended for swimming, bathing and relaxation will be built, as well as slides that can be used by adults and children.The first phase will also include a large “castle” with seven slides, and later a tall mega slide with other facilities will be added. There are locker rooms, toilets and other mandatory facilities for managing the aquapark, but most of the space will be used for catering and entertainment facilities that can operate throughout the year – club space in the basement, restaurant on the ground floor with terrace, large hall on the first floor which will serve for a larger number of guests and various ceremonies, exercise halls, wellness, spa or beauty facilities and the like.The estimated value of the project is 6 million euros, and the Aquapark Zelina project is also included in the list of capital projects of the Investment and Competitiveness Agency.last_img

Leave a Reply

Your email address will not be published. Required fields are marked *